DOI:10.24411/2076-6785-2020-10084
Abstract
Carrying out work on involving in the development of non-drained sections of the reservoir and resuscitation of an inactive well stock is an extremely urgent problem at present. Reducing the economic cost of drilling new wells contributes to the use of technology for drilling horizontal lateral shafts and horizontal wells from an existing, but not exploited, well stock.
Materials and methods
Based on the analysis of practical material.
Keywords
side horizontal trunks, side trunks, BGS, an increase in oil reserves