Abstract
At the late stage of field development, there is a decrease in production volumes compared to the design capacity of the infrastructure, which leads to the risks of liquid accumulation in the elements of the “formation – well –plume system”. To eliminate potential problems, it is important to identify the places of fluid accumulation in a timely manner and plan measures to ensure the stable operation of pipelines [3, 4].
Materials and methods
The article discusses the operation of the gas collection network with parameters corresponding to typical conditions for deposits in the final period of the development of the object.
The obtained results can be applied to substantiate the implementation of technological measures in the fields.
Keywords
gas field management, gas production, production engineering, dynamic modeling, technological regime